| River Bridge across Thoothapuzha Connecting Edappalam in Palakkad and Moorkanad in Malappuram District |
1. Total Length of bridge 231.5m 2. Width of Carriage way 7.5m 3. Total width of bridge including foot path 10.5m 4. Period of completion 12months 5. Contractor for the project Kiliyanal Constructions Pvt Ltd 6. Consultant KITCO Ltd 7.Present status of the work - 9/10 span completed.RC wall on both side completed. |