River Bridge across Thoothapuzha Connecting Edappalam in Palakkad and Moorkanad in Malappuram District
 

 

1. Total Length of bridge                                                       231.5m

2. Width of Carriage way                                                            7.5m

3. Total width of bridge including foot path                          10.5m

4. Period of completion                                                         12months

5. Contractor for the project                             Kiliyanal Constructions Pvt Ltd

6. Consultant                                                                          KITCO Ltd

7.Present status of the work  - 9/10 span completed.RC wall on both side completed.

 

 

 

 

 

 

 

 

 

 